Our Projects

Project

River Of Life (Phase 2)


River of Life (ROL) is continued with Phase 2 yet with the same objective as per previous phase, to bring the community ‘back’ to the river through connecting, transforming and invigorating the river context into the vibrant waterfront, embracing the city’s rich historical, cultural and heritage values, and re-connecting it to the surrounding urban fabric.

The projects are divided into two zone spreading along Klang Rivers to Gombak, still with three stages of work – river cleaning, river beautification and river economics.

As a main contractor, Azza Mewah Sdn Bhd is responsible with the construction of the next phase two of River of Life (ROL) which covered Zone 3A and Zone 3B. Klang river stretching from Jalan Ipoh and Tiong Nam towards Jalan Sultan Ismail and Jalan Kuching is called Zone 3A whilst starting from SJK (C) Chung Kwok until DBKL building and along Jalan Ampang is called Zone 3B. AMSB is responsible to realise the objective into action and work by following master planning and beautification component of the project from consultant and client.

rv
rv2
rv3
rv4
rv5-interceptor

Project

Tunnel at Tun Razak Exchange


The Tun Razak Exchange (TRX) is an iconic 70-acre development in the heart of Kuala Lumpur that is set to become a leading centre for international finance and business. The first phase of development of TRX is anchored by four office towers including the Signature Tower, a lifestyle retail mall, hotels and residential towers.

To cater for traffic heading in and out of TRX, an ingress and egress tunnel will be constructed providing connectivity to the existing Jalan Tun Razak, Bulatan kampong Pandan, Maju Expressway (MEX) and the future Setiawangsa Pantai Expressway (SPE) via the elevated roads being implemented by DBKL.

The ingress tunnel to TRX will begin adjacent to the car park situated beside the RHB Centre before heading into the car park basement of TRX. The egress tunnel beings from the TRX car park basement and ends at the front of TREC KL.

tr1
tr2
tr3
tr4

Project

Upgrading of Jalan Duta Tunnel


This project involves the construction of an addition new tunnel by the side of the existing tunnel, to increase the capacity for traffic flow. Before this new tunnel is constructed, the existing tunnel was a bottleneck for traffic travelling from Jalan Duta to Lebuhraya Mahameru.

204
330
347
Picture 768
343
317

Project

Jalan Kuching Bridge


This bridge, connecting Jalan Raja Laut (at the vicinity of the SOGO shopping complex) and Jalan Kuching, acts as a traffic dispersal link. It allows traffic from the city to exit quickly from Jalan Raja Laut and disperse onto Jalan Kuching in both the North and South directions.

Jalan Kuching Bridge
Jalan Kuching Bridge 3
Jalan Kuching Bridge 5
Jalan Kuching Bridge 2
Jalan Kuching Bridge 4

Project

Seremban Ampangan


This parcel of land occupied a total area of 25 acres. It is surrounded by very matured housing area, and is the last parcel of land to be developed in the area. This development will provide additional good quality and affordable houses in the area. The GDV for the project is estimated to be RM119 millions.

home-terrace-m
home-townhouse

Project

China


The property development projects in China consist of the construction of residential apartments and commercial shop lots. Apart from the projects completed and sold, the company has also maintained a land bank consisting of parcels of land with good potential for future development.

china
1.1
hotel
114205
2
front

Please contact us for more project details.

Contact Us